Saturday 30 August 2014

September is just around the corner!!!

Well, a couple more days till September is here!

In our house that means back to school for the little one - and this year back to school for me too! (though I start a week after my son). 

The last couple weeks I have been working on projects not yet on here... but I will post them soon (as I complete them).   - I've even been working on my hexies a bit again!
This coming week though hubby has taken some extra time off work, to spend time as a family before school starts - as then holiday season is right around the corner!!!!

Hope you are all ready for the coming change of season!

I will continue to update, weekly.... but don't be shocked if the pace slows down a bit - like I don't think I will be adding any more goals for the rest of the year lately - got two more quilt I want to start.... and one I hope to finish....  but other than that, hoping to finish some of these MANY projects I have on the go! (Like Downton Abbey, the whole cloth, and the top of Bella Verona!!!)

Have fun quilting! And feel free to comment any time!

Aug 25-29th UPDATE

I have made this for two months, as I really need to focus on getting Downton Abbey finished and off the frame considering what has now arrived in the mail. (So excited, will share shortly).  So it will be my main focus for the month of August, so most of these things I am hoping to accomplish in September (with a few exceptions)
(I have also decided to go back to school, so that is going to also cut down on sewing time....)

August AND September Goals:

Previous Uncompleted Goals:
1. Downton Abbey hand quilting - FINISHED THE SECOND ROW!!! AMAZING!
2. Month 4 Hook line and sinker stitching
3. Trace and colour Month 5 Gingerbread
4. Stitch Gingerbread Month 5
5. Do Cutting directions for WOB Block # 53
6. Cut WOB Block 53
7. Sew WOB Block 53
8. Tutorials for WOB Block 53
9. Trace and colour Month 5 Hook Line and Sinker
10. Stitch month 5 Hook line and sinker
11. Trace and colour month 6 Gingerbread
12. Cut WOB Week 32 - DONE
13. Sew WOB Week 32 - DONE
Week 32 - Esther

14. Tops Birthday Placemat
15. Baste Birthday Placemat
16. Quilt Birthday Placemat
17. Bind Birthday Placemat
18. Trace and Colour Month 6 Hook Line and Sinker
19. Stitch Month 6 Hook Line and Sinker
20. Trace and Colour Month 7 Gingerbread
21. Stitch Month 7 Gingerbread

*Note: I did get placemat kit for July, but seeing as it is American themed and I am Canadian, we are going to make a Birthday placemat for when it is that special day in our house :)

Week Specific Goals:
Aug 25 - 29th: Read Athaliah and Jehosheba - DONE
Sept 1 - 5th: Read Huldah
Sept 8 - 12th: Read Esther
Sept 15 - 19th: Read Woman of Proverbs 31
Sept 22 - 26th: Read Shulammite Woman
Sept 29th - Oct 3rd: Read Gomer


Goals Added for August:
1. Cut WOB Week 33, 34, 35, 36, 37, 38 (33, 34, 35 is DONE!)
2. Sew WOB Week 33, 34, 35, 36, 37, 38 (33, 34, 35 are DONE!)
Week 33 - Women of Proverbs 31

Week 34 - the Shulammite Woman
 
Week 35 - Gomer

3. Tutorials WOB Week 32, 33, 34, 35, 36, 37, 38 (32, 33, 34, 35 DONE)
4. Cutting Directions for WOB Week 36, 37, 38, 39, 41 (36 and 37 DONE)
5. Baste Aug. Placemats
6. Quilt Aug Placemats
7. Bind aug. Placemats
8. Top done for Bella Verona
9. Trace and Colour Month 7 or Hook Line and Sinker
10. Stitch Month 7 of Hook Line and SInker
11. Trace and Colour month 8 of Hook Line and SInker
12. Stitch Month 8 of Hook Line and Sinker
13. Trace and Colour Month 8 of Gingerbread
14. Stitch Month 8 of Gingerbread
15. Trace and Colour Month 9 of Gingerbread
15. Stich month 9 of Gingerbread

Quilts working on:
Dear Jane
Downton
Hook Line Sinker
Gingerbread Squared
Omigosh
Cathedral Windows #2
Swoon
Night Sky
Refractured
Snowman Gatherings
2013 Stonehenge BOM
Gumdrops
Hexies
Bella Verona
Connor's Quilt

Sunday 24 August 2014

UPDATE - Aug 18-22nd

I have made this for two months, as I really need to focus on getting Downton Abbey finished and off the frame considering what has now arrived in the mail. (So excited, will share shortly).  So it will be my main focus for the month of August, so most of these things I am hoping to accomplish in September (with a few exceptions)

August AND September Goals:

Previous Uncompleted Goals:
1. Downton Abbey hand quilting - DONE THE FIRST ROW!!!!
2. Month 4 Hook line and sinker stitching
3. Trace and colour Month 5 Gingerbread
4. Stitch Gingerbread Month 5
5. Do Cutting directions for WOB Block # 53
6. Cut WOB Block 53
7. Sew WOB Block 53
8. Tutorials for WOB Block 53
9. Trace and colour Month 5 Hook Line and Sinker
10. Stitch month 5 Hook line and sinker
11. Trace and colour month 6 Gingerbread
12. Cut WOB Week 32
13. Sew WOB Week 32
14. Tops Birthday Placemat
15. Baste Birthday Placemat
16. Quilt Birthday Placemat
17. Bind Birthday Placemat
18. Trace and Colour Month 6 Hook Line and Sinker
19. Stitch Month 6 Hook Line and Sinker
20. Trace and Colour Month 7 Gingerbread
21. Stitch Month 7 Gingerbread

*Note: I did get placemat kit for July, but seeing as it is American themed and I am Canadian, we are going to make a Birthday placemat for when it is that special day in our house :)

Week Specific Goals:
Aug 18 - 22th: Read Shunammite Woman - DONE!
Aug 25 - 29th: Read Athaliah and Jehosheba
Sept 1 - 5th: Read Huldah
Sept 8 - 12th: Read Esther
Sept 15 - 19th: Read Woman of Proverbs 31
Sept 22 - 26th: Read Shulammite Woman
Sept 29th - Oct 3rd: Read Gomer


Goals Added for August:
1. Cut WOB Week 33, 34, 35, 36, 37, 38
2. Sew WOB Week 33, 34, 35, 36, 37, 38
3. Tutorials WOB Week 34, 35, 36, 37, 38
4. Cutting Directions for WOB Week 36, 37, 38, 39, 41
5. Baste Aug. Placemats
6. Quilt Aug Placemats
7. Bind aug. Placemats
8. Top done for Bella Verona
9. Trace and Colour Month 7 or Hook Line and Sinker
10. Stitch Month 7 of Hook Line and SInker
11. Trace and Colour month 8 of Hook Line and SInker
12. Stitch Month 8 of Hook Line and Sinker
13. Trace and Colour Month 8 of Gingerbread
14. Stitch Month 8 of Gingerbread
15. Trace and Colour Month 9 of Gingerbread
15. Stich month 9 of Gingerbread

Quilts working on:
Dear Jane
Downton
Hook Line Sinker
Gingerbread Squared
Omigosh
Cathedral Windows #2
Swoon
Night Sky
Refractured
Snowman Gatherings
2013 Stonehenge BOM
Gumdrops
Hexies
Bella Verona
Connor's Quilt

Sunday 17 August 2014

Aug 11th - 15th UPDATE

I have made this for two months, as I really need to focus on getting Downton Abbey finished and off the frame considering what has now arrived in the mail. (So excited, will share shortly).  So it will be my main focus for the month of August, so most of these things I am hoping to accomplish in September (with a few exceptions)

August AND September Goals:

Previous Uncompleted Goals:
1. Downton Abbey hand quilting - DONE THE FIRST ROW!!!!
2. Month 4 Hook line and sinker stitching
3. Trace and colour Month 5 Gingerbread
4. Stitch Gingerbread Month 5
5. Do Cutting directions for WOB Block # 53
6. Cut WOB Block 53
7. Sew WOB Block 53
8. Tutorials for WOB Block 53
9. Trace and colour Month 5 Hook Line and Sinker
10. Stitch month 5 Hook line and sinker
11. Trace and colour month 6 Gingerbread
12. Cut WOB Week 32
13. Sew WOB Week 32
14. Tops Birthday Placemat
15. Baste Birthday Placemat
16. Quilt Birthday Placemat
17. Bind Birthday Placemat
18. Trace and Colour Month 6 Hook Line and Sinker
19. Stitch Month 6 Hook Line and Sinker
20. Trace and Colour Month 7 Gingerbread
21. Stitch Month 7 Gingerbread

*Note: I did get placemat kit for July, but seeing as it is American themed and I am Canadian, we are going to make a Birthday placemat for when it is that special day in our house :)

Week Specific Goals:
Aug 11 - 15th: Read Widow of Zarapeth - DONE
Aug 18 - 22th: Read Shunammite Woman
Aug 25 - 29th: Read Athaliah and Jehosheba
Sept 1 - 5th: Read Huldah
Sept 8 - 12th: Read Esther
Sept 15 - 19th: Read Woman of Proverbs 31
Sept 22 - 26th: Read Shulammite Woman
Sept 29th - Oct 3rd: Read Gomer


Goals Added for August:
1. Cut WOB Week 33, 34, 35, 36, 37, 38
2. Sew WOB Week 33, 34, 35, 36, 37, 38
3. Tutorials WOB Week 34, 35, 36, 37, 38
4. Cutting Directions for WOB Week 36, 37, 38, 39, 41
5. Baste Aug. Placemats
6. Quilt Aug Placemats
7. Bind aug. Placemats
8. Top done for Bella Verona
9. Trace and Colour Month 7 or Hook Line and Sinker
10. Stitch Month 7 of Hook Line and SInker
11. Trace and Colour month 8 of Hook Line and SInker
12. Stitch Month 8 of Hook Line and Sinker
13. Trace and Colour Month 8 of Gingerbread
14. Stitch Month 8 of Gingerbread
15. Trace and Colour Month 9 of Gingerbread
15. Stich month 9 of Gingerbread

Quilts working on:
Dear Jane
Downton
Hook Line Sinker
Gingerbread Squared
Omigosh
Cathedral Windows #2
Swoon
Night Sky
Refractured
Snowman Gatherings
2013 Stonehenge BOM
Gumdrops
Hexies
Bella Verona
Connor's Quilt

Saturday 9 August 2014

August 4 - 8th UPDATE

I have made this for two months, as I really need to focus on getting Downton Abbey finished and off the frame considering what has now arrived in the mail. (So excited, will share shortly).  So it will be my main focus for the month of August, so most of these things I am hoping to accomplish in September (with a few exceptions)

August AND September Goals:

Previous Uncompleted Goals:
1. Downton Abbey hand quilting - DONE THE FIRST ROW!!!!
2. Month 4 Hook line and sinker stitching
3. Trace and colour Month 5 Gingerbread
4. Stitch Gingerbread Month 5
5. Do Cutting directions for WOB Block # 53
6. Cut WOB Block 53
7. Sew WOB Block 53
8. Tutorials for WOB Block 53
9. Trace and colour Month 5 Hook Line and Sinker
10. Stitch month 5 Hook line and sinker
11. Trace and colour month 6 Gingerbread
12. Cut WOB Week 31, 32 - week 31 DONE
13. Sew WOB Week 31, 32
Week 31 - Huldah

14. Tops Birthday Placemat
15. Baste Birthday Placemat
16. Quilt Birthday Placemat
17. Bind Birthday Placemat
18. Trace and Colour Month 6 Hook Line and Sinker
19. Stitch Month 6 Hook Line and Sinker
20. Trace and Colour Month 7 Gingerbread
21. Stitch Month 7 Gingerbread

*Note: I did get placemat kit for July, but seeing as it is American themed and I am Canadian, we are going to make a Birthday placemat for when it is that special day in our house :)

Week Specific Goals:
Aug 4 - 8th: Read Jezebel - DONE!
Aug 11 - 15th: Read Widow of Zarapeth
Aug 18 - 22th: Read Shunammite Woman
Aug 25 - 29th: Read Athaliah and Jehosheba
Sept 1 - 5th: Read Huldah
Sept 8 - 12th: Read Esther
Sept 15 - 19th: Read Woman of Proverbs 31
Sept 22 - 26th: Read Shulammite Woman
Sept 29th - Oct 3rd: Read Gomer


Goals Added for August:
1. Cut WOB Week 33, 34, 35, 36, 37, 38
2. Sew WOB Week 33, 34, 35, 36, 37, 38
3. Tutorials WOB Week 34, 35, 36, 37, 38
4. Cutting Directions for WOB Week 36, 37, 38, 39, 41
5. Baste Aug. Placemats
6. Quilt Aug Placemats
7. Bind aug. Placemats
8. Top done for Bella Verona
9. Trace and Colour Month 7 or Hook Line and Sinker
10. Stitch Month 7 of Hook Line and SInker
11. Trace and Colour month 8 of Hook Line and SInker
12. Stitch Month 8 of Hook Line and Sinker
13. Trace and Colour Month 8 of Gingerbread
14. Stitch Month 8 of Gingerbread
15. Trace and Colour Month 9 of Gingerbread
15. Stich month 9 of Gingerbread

Wasn't on the list, but got this Women of the Bible Block done too...
Week 40 - Woman Who Lived A Sinful Life
  
Also got Connor's quilt basted!!! Hopefully will be done soon!

Quilts working on:
Dear Jane
Downton
Hook Line Sinker
Gingerbread Squared
Omigosh
Cathedral Windows #2
Swoon
Night Sky
Refractured
Snowman Gatherings
2013 Stonehenge BOM
Gumdrops
Hexies
Bella Verona
Connor's Quilt

Monday 4 August 2014

AUGUST and SEPTEMBER GOALS:

I have made this for two months, as I really need to focus on getting Downton Abbey finished and off the frame considering what has now arrived in the mail. (So excited, will share shortly).  So it will be my main focus for the month of August, so most of these things I am hoping to accomplish in September (with a few exceptions)

August AND September Goals:

Previous Uncompleted Goals:
1. Downton Abbey hand quilting
2. Month 4 Hook line and sinker stitching
3. Trace and colour Month 5 Gingerbread
4. Stitch Gingerbread Month 5
5. Do Cutting directions for WOB Block # 53
6. Cut WOB Block 53
7. Sew WOB Block 53
8. Tutorials for WOB Block 53
9. Trace and colour Month 5 Hook Line and Sinker
10. Stitch month 5 Hook line and sinker
11. Trace and colour month 6 Gingerbread
12. Cut WOB Week 31, 32
13. Sew WOB Week 31, 32
14. Tops Birthday Placemat
15. Baste Birthday Placemat
16. Quilt Birthday Placemat
17. Bind Birthday Placemat
18. Trace and Colour Month 6 Hook Line and Sinker
19. Stitch Month 6 Hook Line and Sinker
20. Trace and Colour Month 7 Gingerbread
21. Stitch Month 7 Gingerbread

*Note: I did get placemat kit for July, but seeing as it is American themed and I am Canadian, we are going to make a Birthday placemat for when it is that special day in our house :)

Week Specific Goals:
Aug 4 - 8th: Read Jezebel
Aug 11 - 15th: Read Widow of Zarapeth
Aug 18 - 22th: Read Shunammite Woman
Aug 25 - 29th: Read Athaliah and Jehosheba
Sept 1 - 5th: Read Huldah
Sept 8 - 12th: Read Esther
Sept 15 - 19th: Read Woman of Proverbs 31
Sept 22 - 26th: Read Shulammite Woman
Sept 29th - Oct 3rd: Read Gomer


Goals Added for August:
1. Cut WOB Week 33, 34, 35, 36, 37, 38
2. Sew WOB Week 33, 34, 35, 36, 37, 38
3. Tutorials WOB Week 34, 35, 36, 37, 38
4. Cutting Directions for WOB Week 36, 37, 38, 39, 41
5. Baste Aug. Placemats
6. Quilt Aug Placemats
7. Bind aug. Placemats
8. Top done for Bella Verona
9. Trace and Colour Month 7 or Hook Line and Sinker
10. Stitch Month 7 of Hook Line and SInker
11. Trace and Colour month 8 of Hook Line and SInker
12. Stitch Month 8 of Hook Line and Sinker
13. Trace and Colour Month 8 of Gingerbread
14. Stitch Month 8 of Gingerbread
15. Trace and Colour Month 9 of Gingerbread
15. Stich month 9 of Gingerbread

Quilts working on:
Dear Jane
Downton
Hook Line Sinker
Gingerbread Squared
Omigosh
Cathedral Windows #2
Swoon
Night Sky
Refractured
Snowman Gatherings
2013 Stonehenge BOM
Gumdrops
Hexies
Bella Verona
Connor's Quilt

Sunday 3 August 2014

SO excited......

Months in the making, but I am FINALLY done the FIRST row of Downton Abbey quilting.  Only taken me MONTHS!

Hopefully things will move a lot faster now!
 
 
Already rolled to the next section and working on it. :)

Saturday 2 August 2014

July 28 - Aug 1st UPDATE


July Goals:

Previous Uncompleted Goals:
1. Downton Abbey hand quilting
2. Month 4 Hook line and sinker stitching
3. Trace and colour Month 5 Gingerbread
4. Stitch Gingerbread Month 5
5. Do Cutting directions for WOB Block # 53
6. Cut WOB Block 53
7. Sew WOB Block 53
8. Tutorials for WOB Block 53
9. Trace and colour Month 5 Hook Line and Sinker
10. Stitch month 5 Hook line and sinker
11. Trace and colour month 6 Gingerbread

Week Specific:
July 28 -  Aug 1st: Read Queen of Sheba - DONE

New Goals for July:
1. Cut WOB Week 30, 31, 32 (30 is DONE!)
2. Sew WOB Week 30, 31, 32 (30 is DONE!)
Week 30 - Athaliah and Jehosheba

3. Tutorials WOB Week 30. - DONE!
4. Tops July Placemats
5. Baste July Placemats
6. Quilt July Placemats
7. Bind July Placemats
8. Trace and Colour Month 6 Hook Line and Sinker
9. Stitch Month 6 Hook Line and Sinker
10. Trace and Colour Month 7 Gingerbread
11. Stitch Month 7 Gingerbread
*Note: I don't think I am getting placemats for July, so those may not need to be done at all...*

Quilts working on:
Dear Jane
Downton
Hook Line Sinker
Gingerbread Squared
Omigosh
Cathedral Windows #2
Swoon
Night Sky
Refractured
Snowman Gatherings
2013 Stonehenge BOM
Gumdrops
Hexies
Bella Verona
Connor's Quilt

Friday 1 August 2014

URGENT, STOLEN QUILTS!

Nancy Rink, a fellow quilter, has had a number of quilts stolen from her studio.

Her facebook link is here https://www.facebook.com/nancy.rink.7/media_set?set=a.10202541306233479.1073741827.1220573831&type=3

I have also shared on my facebook page.

Nancy has offered a reward for their safe return, and I hope they are returned safely.

Please keep an eye out, social media can be a powerful thing!