Showing posts with label Downton Abbey. Show all posts
Showing posts with label Downton Abbey. Show all posts

Saturday, 30 August 2014

Aug 25-29th UPDATE

I have made this for two months, as I really need to focus on getting Downton Abbey finished and off the frame considering what has now arrived in the mail. (So excited, will share shortly).  So it will be my main focus for the month of August, so most of these things I am hoping to accomplish in September (with a few exceptions)
(I have also decided to go back to school, so that is going to also cut down on sewing time....)

August AND September Goals:

Previous Uncompleted Goals:
1. Downton Abbey hand quilting - FINISHED THE SECOND ROW!!! AMAZING!
2. Month 4 Hook line and sinker stitching
3. Trace and colour Month 5 Gingerbread
4. Stitch Gingerbread Month 5
5. Do Cutting directions for WOB Block # 53
6. Cut WOB Block 53
7. Sew WOB Block 53
8. Tutorials for WOB Block 53
9. Trace and colour Month 5 Hook Line and Sinker
10. Stitch month 5 Hook line and sinker
11. Trace and colour month 6 Gingerbread
12. Cut WOB Week 32 - DONE
13. Sew WOB Week 32 - DONE
Week 32 - Esther

14. Tops Birthday Placemat
15. Baste Birthday Placemat
16. Quilt Birthday Placemat
17. Bind Birthday Placemat
18. Trace and Colour Month 6 Hook Line and Sinker
19. Stitch Month 6 Hook Line and Sinker
20. Trace and Colour Month 7 Gingerbread
21. Stitch Month 7 Gingerbread

*Note: I did get placemat kit for July, but seeing as it is American themed and I am Canadian, we are going to make a Birthday placemat for when it is that special day in our house :)

Week Specific Goals:
Aug 25 - 29th: Read Athaliah and Jehosheba - DONE
Sept 1 - 5th: Read Huldah
Sept 8 - 12th: Read Esther
Sept 15 - 19th: Read Woman of Proverbs 31
Sept 22 - 26th: Read Shulammite Woman
Sept 29th - Oct 3rd: Read Gomer


Goals Added for August:
1. Cut WOB Week 33, 34, 35, 36, 37, 38 (33, 34, 35 is DONE!)
2. Sew WOB Week 33, 34, 35, 36, 37, 38 (33, 34, 35 are DONE!)
Week 33 - Women of Proverbs 31

Week 34 - the Shulammite Woman
 
Week 35 - Gomer

3. Tutorials WOB Week 32, 33, 34, 35, 36, 37, 38 (32, 33, 34, 35 DONE)
4. Cutting Directions for WOB Week 36, 37, 38, 39, 41 (36 and 37 DONE)
5. Baste Aug. Placemats
6. Quilt Aug Placemats
7. Bind aug. Placemats
8. Top done for Bella Verona
9. Trace and Colour Month 7 or Hook Line and Sinker
10. Stitch Month 7 of Hook Line and SInker
11. Trace and Colour month 8 of Hook Line and SInker
12. Stitch Month 8 of Hook Line and Sinker
13. Trace and Colour Month 8 of Gingerbread
14. Stitch Month 8 of Gingerbread
15. Trace and Colour Month 9 of Gingerbread
15. Stich month 9 of Gingerbread

Quilts working on:
Dear Jane
Downton
Hook Line Sinker
Gingerbread Squared
Omigosh
Cathedral Windows #2
Swoon
Night Sky
Refractured
Snowman Gatherings
2013 Stonehenge BOM
Gumdrops
Hexies
Bella Verona
Connor's Quilt

Saturday, 9 August 2014

August 4 - 8th UPDATE

I have made this for two months, as I really need to focus on getting Downton Abbey finished and off the frame considering what has now arrived in the mail. (So excited, will share shortly).  So it will be my main focus for the month of August, so most of these things I am hoping to accomplish in September (with a few exceptions)

August AND September Goals:

Previous Uncompleted Goals:
1. Downton Abbey hand quilting - DONE THE FIRST ROW!!!!
2. Month 4 Hook line and sinker stitching
3. Trace and colour Month 5 Gingerbread
4. Stitch Gingerbread Month 5
5. Do Cutting directions for WOB Block # 53
6. Cut WOB Block 53
7. Sew WOB Block 53
8. Tutorials for WOB Block 53
9. Trace and colour Month 5 Hook Line and Sinker
10. Stitch month 5 Hook line and sinker
11. Trace and colour month 6 Gingerbread
12. Cut WOB Week 31, 32 - week 31 DONE
13. Sew WOB Week 31, 32
Week 31 - Huldah

14. Tops Birthday Placemat
15. Baste Birthday Placemat
16. Quilt Birthday Placemat
17. Bind Birthday Placemat
18. Trace and Colour Month 6 Hook Line and Sinker
19. Stitch Month 6 Hook Line and Sinker
20. Trace and Colour Month 7 Gingerbread
21. Stitch Month 7 Gingerbread

*Note: I did get placemat kit for July, but seeing as it is American themed and I am Canadian, we are going to make a Birthday placemat for when it is that special day in our house :)

Week Specific Goals:
Aug 4 - 8th: Read Jezebel - DONE!
Aug 11 - 15th: Read Widow of Zarapeth
Aug 18 - 22th: Read Shunammite Woman
Aug 25 - 29th: Read Athaliah and Jehosheba
Sept 1 - 5th: Read Huldah
Sept 8 - 12th: Read Esther
Sept 15 - 19th: Read Woman of Proverbs 31
Sept 22 - 26th: Read Shulammite Woman
Sept 29th - Oct 3rd: Read Gomer


Goals Added for August:
1. Cut WOB Week 33, 34, 35, 36, 37, 38
2. Sew WOB Week 33, 34, 35, 36, 37, 38
3. Tutorials WOB Week 34, 35, 36, 37, 38
4. Cutting Directions for WOB Week 36, 37, 38, 39, 41
5. Baste Aug. Placemats
6. Quilt Aug Placemats
7. Bind aug. Placemats
8. Top done for Bella Verona
9. Trace and Colour Month 7 or Hook Line and Sinker
10. Stitch Month 7 of Hook Line and SInker
11. Trace and Colour month 8 of Hook Line and SInker
12. Stitch Month 8 of Hook Line and Sinker
13. Trace and Colour Month 8 of Gingerbread
14. Stitch Month 8 of Gingerbread
15. Trace and Colour Month 9 of Gingerbread
15. Stich month 9 of Gingerbread

Wasn't on the list, but got this Women of the Bible Block done too...
Week 40 - Woman Who Lived A Sinful Life
  
Also got Connor's quilt basted!!! Hopefully will be done soon!

Quilts working on:
Dear Jane
Downton
Hook Line Sinker
Gingerbread Squared
Omigosh
Cathedral Windows #2
Swoon
Night Sky
Refractured
Snowman Gatherings
2013 Stonehenge BOM
Gumdrops
Hexies
Bella Verona
Connor's Quilt

Sunday, 3 August 2014

SO excited......

Months in the making, but I am FINALLY done the FIRST row of Downton Abbey quilting.  Only taken me MONTHS!

Hopefully things will move a lot faster now!
 
 
Already rolled to the next section and working on it. :)

Thursday, 24 July 2014

Motivation.... GONE!

Well, it would appear my motivation for my Women of the Bible quilt has left this week.... and I still have SO much to do on it. :(  I have been playing around online with it abit - organizing, etc.  I now know exactly what patterns I have to print for paper-piecing, applique, etc.... ugh.

Last night I pulled out the UNFINISHED 2013 Stonehendge BOM.  (Got it in early 2013 all at once as a kit... can probably tell you exactly if I bothered to look).
Anyways, realized that I have the fabric still (the borders uncut!), and the 12 blocks and the 8000 little pieces that go everwhere.... but I've lost the directions - including how BIG to cut said borders.  Well.  That just makes life more fun.  Oh ya, and the little triangle pieces I have to include in the first border.... hmm.  Joys.
At least I got the rows done... and can sew the centre together before the challenging part begins.... little steps!
Hopefully by the time I wrangle this together the ink comes so I can get some major progress on this WOB quilt.  Please please please. 

And I have and immense urge to work on my Dear Jane... but feel I should finish quilting Downton first.... oh the list never ends ;)

But if you do look back on my goal updates, I am making SOME progress.
Summer HAS slowed me down, and well, September will as well, what with starting back at college, etc.  Like I said, it NEVER ends....

Monday, 16 June 2014

JUNE GOALS:

For the rest of June, I will be working on the month as a whole.... well Until July 4th. 

There are lots of days where the kids are home/family events/meetings/etc. 

As a result I am trying to catch up on previously uncompleted, with very little added... If I get it done though, I will add more!

I will still be updating weekly (in part to keep the picture attachments to a minimum size per post).

Previously Uncompleted Goals:
1. Downton Abbey hand quilting
2. Month 4 Hook line and sinker stitching
3. Trace and colour Month 5 Gingerbread
4. Sew WOB B lock #21
5. Stitch Gingerbread Month 5
6. Finish 1st seam on Connors quilt
7. Pin next seam on Connor's quilt
8. Do Cutting directions for WOB Block # 53
9. Cut WOB block #25
10. Sew WOB block #25
11. Tutorial for WOB Block #25
12. Tops for May Blackmats
13. Cut WOB Blocks 28 and 53
14. Sew WOB Blocks 28 and 53
15. Tutorials for WOB Blocks 28 and 53

Week Specific Goals:

June 16 - 20th - Read Abigail
June 23 - 27th - Read Woman of Endor
June 30th to July 4th - Read Bathsheba

Add for the MONTH of June:
1. Baste May Placemats
2. Quilt May Placemats
3. Bind May placemats
4. Tops for June Placemats
5. Trace and colour Month 5 Hook Line and Sinker
6. Stitch month 5 Hook line and sinker
7. Trace and colour month 6 Gingerbread
8.  Trim Connor's quilt blocks...

Sunday, 1 June 2014

Update - Goals May 26 - 30

Okay, so I am going to post the goals for ALL THREE weeks, at once, and mark what I get done....  The ones I SHOULD be working on will be highlighted in red - unless they are done, then I will make them green!!   A little off the standard format, but this way if I get on a roll with a project, and I change slightly..... just to make the next few busy weeks a little easier and manageable...

PREVIOUSLY UNCOMPLETED:
1. Cut 2 WOB Blocks
2. Complete 1 row Downton
3. Sew 2 WOB Blocks
4. Tutorials for 2 WOB Blocks
5. Trace and colour Gingerbread 5
6. Finish month 4 Hook line and sinker
7. Cut 2 more WOB blocks
8. Sew 2 more WOB Blocks
9. Tutorials for 2 more WOB Blocks
10. Baste April Placemats - DONE
11. Binding on last sibling quilt.


New for March 26 - 30
1. Quilt April Placemats - DONE!
2. stitch gingerbread 5
3. Read Ruth from WOB - DONE!
4. Cut 2 WOB blocks
5. Finish first seam on Connor quilt blocs
6. Pin Next seam on COnnor quilt blocks
7. Sew 2 WOB blocks (no tutorial ones)

New for June 2 - 6
1. Bind April Placemats - DONE!
2. Read Hannah
3. Cut 2 WOB Blocks
4. Stitch 2 WOB Blocks
5. Tutorials for 2 WOB Blocks
6. Stitch 2 more WOB Blocks
7. 2 more WOB tutorials
8. Tops for May Placemats

New for June 9-13
1. Read Michal
2. Baste May Placemats

Saturday, 24 May 2014

UPDATE - week of May 19th - 23rd

Was set up to be a busy week - especially with the hubby and kid home for 2 days each....

1. Cut 3 WOB Blocks (Bathsheba, _____, _______ ) - Done Bathsheba,


2. Sew 1 WOB Block (Bathsheba) - Done! 
Week 22 - Bathsheba

3. Complete 1 row Downton quilting


4. Ruler for hook, Line, Sinker - DONE!



5. Sew 2 more WOB Blocks


6. Post tutorials for 4 WOB Blocks (Michal, Bathsheba, _________ and __________) - Done Michal, Bathsheba
 

7. Trace and Colour Gingerbread #5


8. Finish sewing Month 4 Hook line Sinker


9. Cut 2 more WOB Block (___________, and ____________)


10. Sew 2 WOB Blocks (__________, and ____________)


11. Tutorials for 2 WOB Blocks (___________, and _____________)


12. Baste April Placemats


13. Read Naomi - DONE!

Saturday, 17 May 2014

Update - May 12th - 16th


Well, This week was set up to be quite busy!!!! I didn't plan on getting everything done, but I was hopeful!  And as you can see, I got very little done.... but I tried.  Honest.

1. Read Jael - DONE!

2. Cut 4 WOB Blocks - Done 1


2. Finish the WOB block already started - DONE!
Week 18 - Hannah


3. Sew 2 WOB Blocks. - Done 1
Week 19 - Michal


4. Get the tutorials for 3 blocks posted - DONE!!!

5. Have one completed Downton row


6. Finish Stitching the Ruler for Hook, Line Sinker


7. Sew 2 more WOB Blocks


8. Get the tutorials posted for the 4 additional WOB blocks.


9. Tops done for April Placemats - DONE!  Yay me!  Will post pictures when completely done and bound....

10. Read Delilah - DONE!

Goals - Week of May 12th - 23rd

Another big week.  Lots I want to get done.  Trying to cram as much in as possible before school ends in about a month!

1. Cut 3 WOB Blocks
2. Sew 1 WOB Block
3. Complete 1 row Downton quilting
4. Ruler for hook, Line, Sinker
5. Sew 2 more WOB Blocks
6. Post tutorials for 4 WOB Blocks (Michal, ?, ? and ?)

7. Trace and Colour Gingerbread #5
8. Finish sewing Month 4 Hook line Sinker
9. Cut 2 more WOB Block
10. Sew 2 WOB Blocks
11. Tutorials for 2 WOB Blocks
12. Baste April Placemats
13. Read Naomi

Wow.  Plus some stuff for the guild, and reading a book my daughter wants to read after me.... :) Busy busy!

Sunday, 11 May 2014

Goals - Week of May 12 - 16th

Well, I have added everything I didn't get done last week to this weeks, so it's a pretty full week :)
We shall see how much I get done.... which me luck!

1. Read Jael
2. Cut 4 WOB Blocks
3. Sew 2 WOB Blocks - and finish the one already started (week 18's)
4. Get the tutorials for 3 blocks posted
5. Have one completed Downton Row
6. Finish Stitching the Ruler for Hook, Line Sinker
7. Sew 2 more WOB Blocks
8. Get the tutorials posted for the 2 additional WOB blocks.
9. Tops done for April Placemats
10. Read Delilah

Saturday, 10 May 2014

Update - May 5 - 9th

Okay, well, was a not good week for progress... didn't get much done...

1. Read Jael - will finish it this weekend....


2. Cut 4 WOB blocks - NOPE
3. Sew 2 WOB blocks (and finish last weeks unfinished one) - NOPE


4. Bind one sibling quilt - DONE!!  Will post pictures when they are both done.... I have started a bit on the second.... so hopefully I'll get them done soon!


5. Have 1 completed Downton Row! - NOPE


6. Trace and colour Hook Lie and Sinker Month 4 - start stitching
All traced.... and stitching started :) Two "blocks" this month, the ruler, and the lures....

Monday, 5 May 2014

Goals - Week of May 5 - 9

1. Read Jael
2. Cut 4 WOB blocks
3. Sew 2 WOB blocks (and finish last weeks unfinished one)
4. Bind one sibling quilt
5. Have 1 completed Downton Row!
6. Trace and colour Hook Lie and Sinker Month 4 - start stitching

Saturday, 3 May 2014

Update -week of April 28th - May 2nd


started with 6 goals:

1. Read Deborah - DONE!

2. Gingerbread Squared - stitch 1/2 - I actually finished this!!!  Will post pictures later, as I am now over tired.... BOM class tomorrow morning. Yahoo!

3. Downtown Abbey - finish left side, start right side  - NOPE

4. Bind Placemats from March - DONE


5. Bind 1 sibling quilt - NOPE

6. Sew 3 WOB blocks - 2 done so far! - 3rd one started, but not done.... :(
Week 15 - Delilah

Week 17 - Ruth

Monday, 28 April 2014

Goals - week of April 28 - May 2


Okay.  Goals for the coming week!

1. Read Deborah
2. Gingerbread Squared - stitch approx. 1/2
3. Downton - quilt left side, start on the right
4. Bind March placemats
5. Bind 1 sibling quilt
6. Sew 3 WOB blocks.

Monday, 14 April 2014

Work in Progress - Week April 14th to 18th

Not a large number of goals, but really hoping to get some quilting done on Downton Abbey this week!!

So, here we are:

1. Top half and border embroidered on Hook, Line and Sinker
2. Quilt At least left side of Downton.
3. Trace and colour month FOUR of Gingerbread Squared
4. Baste and quilt the most recent placemats!
5. Cut 2 weeks worth of Women of the Bible.
6 (if I am not ahead of the group) Read Rahab for WOB (I may be ahead though, so this may not need to be done at all....

Saturday, 12 April 2014

April 7-11th goals UPDATE!

Was quite happy with the progress for the week.  The only thing I was disappointed in, was I didn't get any quilting done..... Next week I am going to try to plan less though, so hopefully I get some done!

1. Finish embroidery of Month 3 Gingerbread Squared.
Done...
2. Cut out up to week 16 of Women of the bible
I had to cut week 14, 15, 16.  And I did cut three weeks - just not those three.  ;)  I did week 15, 17 and 18 instead....

3. Read Miriam
DONE - though the study group online posted NOTHING about Miriam, so I may be a week ahead now... will find out on Monday.

4. Finish the March Placemat tops
I did this, but didn't take a quality picture....

5. work on Downton Abbey quilting
Yea, Not.

6. Write up the next directions for Women of the Bible.
I did this and posted them, but hard to really post a photo here...

7. Trace and colour Month 3 for Hook Line and Sinker
I got this done, and I even started stitching... but for now, here is a pic of the colouring being done.

Sunday, 6 April 2014

Work In Progress - April 7 - 11 GOALS

Okay.  So NOTHING got done last week except for the reading of Moses Mom.  So this week is going to be basically the same!

1. Finish embroidery of Month 3 Gingerbread Squared.
2. Cut out up to week 16 of Women of the bible
3. Read Miriam
4. Finish the March Placemat tops
5. work on Downton Abbey quilting
6. Write up the next directions for Women of the Bible.
7. Trace and colour Month 3 for Hook Line and Sinker

Focus is on the embroidery!!!!!!!

Monday, 31 March 2014

March 31 - April 4 Goals

Okay, dreaming big on one item this week, so everything else is minimal...

1. Finish embroidery of Month 3 Gingerbread Squared.
2. Cut out up to week 16 of Women of the bible
3. Read Moses Mom
4. Finish the March Placemat tops
5. work on Downton Abbey quilting
6. Write up the next directions for Women of the Bible.

Focus is on the embroidery!!!!!!!

Friday, 28 March 2014

March 25 - 28 - Goals Update

Okay, so Thursday I spent at a UFO sew in day for my guild.  And got less done than if I stayed home... lol.  Though I did start the hand part of the binding of one of the sibling quilts, so all was not lost.  Why did nothing get accomplished? Well, for starters I forgot my other sewing machine foot - so I only had the quarter inch one... which wasn't what I needed.  Also forgot my thread tree stand thingy, so my thread wouldn't go into the machine properly.  So I stopped, and did hand work....


So, goals for this week.
1. Finish embroidering month 2 Hook, Line and Sinker block.
DONE!!!  see....
changed the name of the lake, and some of the thread colours, but I am very happy with the end result!
 
2. Start Month 3 embroider of Gingerbread Squared
Done.  Not attaching a pic though until the block is completed....

3. Finish quilting the "sibling" quilts
Done. I do have a pic, with the binding even machined on, but not hand stitched (cause hand isn't done yet! But I can't find it... so please just believe me!

4. Cut up to (and including) week 26 of the Women of the Bible blocks.  - Um, not done.  At all. 

5. Post the tutorials for the latest 2 Women of the Bible blocks. - Not done.  At all.  Need to relocate my notes actually....

6. Bind the heart placemats
Done!!  See...



7. Finish the top of the fat 1/4 placemats I got the fabric.
Done, and more.  Got the top done the, then basted at the UFO day, and quilted when I got home - and bound... cause I am awesome...


BONUS:
Quilt current row of Downton Abby
Not done... at all...


Start the next month placemat kit
Done.  Got all the pieces cut out.  Got the birds bonded on... still need to bond the flowers... then applique stitch, finish piecing, etc.  Shouldn't take too long :)

Tuesday, 18 March 2014

Work In Progress - Goals March 17th - 21st

Okay, so next Thursday is UFO day at my Quilt Guild, so trying to plan ahead for that as well!

Goals:
1. Finish month two of Hook, Line and Sinker
2. Get 2 colours of Gingerbread Month 3 done... or a full section depending on how I decide to work on it.
3. Twin Quilts quilted. (extra credit... binding topstitched on).
4. Placemats quilted and trimmed
5.  2 Women of the Bible blocks cut out (extra credit, also sewn!)
6.  Read Potipers Wife
7. (if the kit comes).  Get the March set of placemants pieced, appliqued, and ready to be basted....(extra credit - also quilted and trimmed!)

EXTRA EXTRA CREDIT - quilt left side of Downton Abbey row...

Also get any prep done for Omigosh Quilt, and the Guild quilt to start strip piecing at guild next week...

Okay, so that`s a lot, I`m really pushing it..... here we go!!!